// CASE STUDY // WINDMILL

Baltic Gust Onshore Wind Farm

Baltic Gust Onshore Wind Farm
// PROJECT SHOWCASE

Baltic Gust Onshore Wind Farm

High-wind onshore installation with low acoustic footprint designed for agricultural compatibility.

01. The Engineering Challenge

The site presented severe topographical and environmental hurdles, including high seasonal wind shear, extreme ambient temperature variations, and strict wildlife migration corridor buffer requirements. The regional grid operator mandated a zero-curtailment tolerance during peak solar midday generation.

02. The Enervox EPC Solution

Enervox deployed customized bifacial TOPCon photovoltaic trackers coupled with intelligent sub-second pitch-regulated direct-drive turbines. An integrated containerized lithium-iron-phosphate (LFP) BESS absorbs mid-day power surges and feeds synthetic inertia into the high-voltage substation.

03. Measured Environmental & Economic Impact

Since commissioning in 2024, the installation has operated at a verified 99.85% availability factor. Over 480,000 metric tons of CO2 emissions are avoided annually, displacing local fossil peaker generators and stabilizing the regional transmission loop.

240 MWInstalled Rating
99.8%Annual Uptime
480kTons CO2 Avoided