// CASE STUDY // ENERGY

Nordic Aurora Wind & BESS Hub

Nordic Aurora Wind & BESS Hub
// PROJECT SHOWCASE

Nordic Aurora Wind & BESS Hub

Cold-climate de-icing turbines paired with rapid-discharge battery frequency containment.

01. The Engineering Challenge

The site presented severe topographical and environmental hurdles, including high seasonal wind shear, extreme ambient temperature variations, and strict wildlife migration corridor buffer requirements. The regional grid operator mandated a zero-curtailment tolerance during peak solar midday generation.

02. The Enervox EPC Solution

Enervox deployed customized bifacial TOPCon photovoltaic trackers coupled with intelligent sub-second pitch-regulated direct-drive turbines. An integrated containerized lithium-iron-phosphate (LFP) BESS absorbs mid-day power surges and feeds synthetic inertia into the high-voltage substation.

03. Measured Environmental & Economic Impact

Since commissioning in 2025, the installation has operated at a verified 99.85% availability factor. Over 480,000 metric tons of CO2 emissions are avoided annually, displacing local fossil peaker generators and stabilizing the regional transmission loop.

350 MWInstalled Rating
99.8%Annual Uptime
480kTons CO2 Avoided